How Much Does an Office Fit-Out Cost in Dubai in 2026?

Here are real numbers, not vague ranges pulled from nowhere.

Cost by fit-out type

Fit-Out Type Cost Range (AED/sq ft) What’s Included
CAT A (light refurbishment) 150–350 Raised floors/screed, suspended ceilings, base MEP, standard lighting
CAT B (standard fit-out) 350–700 Partitioning, meeting rooms, pantry/reception joinery, branded finishes, AV, furniture
Premium / turnkey 700–1,200+ Bespoke joinery, high-end finishes, advanced AV/smart systems, full branding

What actually drives the number?

Five things do most of the work: the fit-out category (CAT A vs CAT B), the base building’s condition, MEP complexity (HVAC, electrical load, fire systems), your finish specification, and how complex the approvals process is for your building.

Does office size change the total?

Yes — cost per square foot tends to drop as total area rises, since fixed costs (design fees, project management, approvals) spread across more space. A 500 sq ft office will almost always cost more per square foot than a 5,000 sq ft floor at the same spec.

What’s usually not included in the per-sq-ft rate? Worth asking your contractor directly, since this varies — but approvals costs, furniture procurement, and IT/AV equipment are common exclusions to double-check.

Want an actual number for your space? Send us the size and what you have in mind, and we’ll give you a real figure, not a range. Get a quote →

FAQ

Is CAT A or CAT B cheaper? CAT A, since it’s the base shell preparation. CAT B costs more because it makes the space usable and branded.

Does a bigger office always cost more overall? Yes overall, but less per square foot — fixed costs spread across more area.

Leave a Reply

Your email address will not be published. Required fields are marked *